Polar Air Cargo Hangar at
Prestwick International Airport
 |
We
designed, made and erected the complete
structure using our patented segmental tied portal concept. Design
fabrication and erection took 26 weeks.
A
safety feature is the permanent, all round
Roof Edge Protection for use during construction and for future
maintenance.
|
We
also designed and made the
electro-mechanical doors complete with outriggers to allow full width
opening.
 We ensured that Health
and Safety and CDM regulations were met during
construction, and for the design life of the structure.
Edge
protection and outriggers:
 Hangar
seen from surrounding fields:
 Inside:
   |